Production of blue hydrogen from LNG

Client: Gasnor / Schedule: 2016/17

The goal of this feasibility study was to define and describe a process plant for production of blue hydrogen to the TIZIR plant based upon LNG supplied to the site. The hydrogen shall replace coal in the industrial process at Tizir, Tyssedal.

The objectives have been to identify potential showstoppers related to economical, technical or safety aspects. A rough estimate of the capital costs and operational costs was made to provide an indication of the project cost.