Luno II Trawl Assessment Study

Type of Contract SURF – Trawl study

Client TechnipFMC (Lundin)

Start 2017

Finished 2017



Description

The Luno II field is planned to be a tie-back to the Edward Grieg platform (20 km). it consists of four satellites (2 production and 2 water injection). TechnipFMC are responsible for the FEED phase of the value engineering for Luno II on behalf of Lundin.



Scope of Work

REINERTSEN New Energy was awarded the work of assessing trawl interference in the area. The system consists of water injection, production and gas lift lines as well as an umbilical and was assessed against trawl impact, pullover and hooking. The assessment was performed using the computer software SIMLA.